Construction bookkeeping: job costing, retainage and WIP
Construction books work differently from standard small business books. Here is how job costing, retainage, progress billing, WIP schedules and certified payroll fit together.
Construction bookkeeping differs from ordinary bookkeeping because every job is its own mini business. You track costs and revenue by job, hold back retainage on both sides, bill in stages, and estimate how much of each job is finished. That last piece, the work in progress (WIP) schedule, is what tells you whether you are really making money.
If you run a contractor business with standard books, profit can look fine while individual jobs lose money. This guide explains the parts that make construction different.
Job costing
Job costing means recording every cost against the job it belongs to. It is the foundation for everything else.
Typical cost categories:
- Labor. Hours and wages, including payroll taxes and workers' compensation, assigned to jobs.
- Materials. Purchases tied to a specific job, not dumped into a general expense.
- Subcontractors. Invoices from subs, coded by job.
- Equipment. Rentals, or an allocation for owned equipment.
- Other direct costs. Permits, dump fees, and the like.
Costs are usually coded further into cost codes, such as demolition, framing, or electrical, so you can compare actual cost to your estimate by phase.
Overhead (office rent, owner salary, insurance not tied to a job) stays out of direct job costs. A good setup separates direct job cost from overhead so gross margin by job is meaningful.
The most common failure is coding. A receipt for lumber that lands in "Supplies" instead of Job 214 makes that job look more profitable than it is. Consistent job and cost-code assignment on every bill and every payroll entry is most of the work.
Retainage
Retainage is a portion of each progress payment that the owner holds back until the project, or a stage of it, is complete. Contractors often hold retainage on their subcontractors too, and the terms live in the contracts.
That creates two balances to track:
- Retainage receivable. Money a customer owes you but has withheld. It is an asset, and it should be separate from regular accounts receivable.
- Retainage payable. Money you owe a subcontractor but have withheld. It is a liability, separate from regular accounts payable.
If you mix retainage into normal receivables, your aging report looks worse than reality and collection follow-ups become confusing. If you ignore retainage payable, your liabilities are understated. Track both by job, and list the release conditions from the contract so someone knows when to bill or pay the held amounts. For collecting the regular invoices faster, see how to cut days sales outstanding.
Retainage rules vary by contract and by state, so rely on your contracts and confirm anything unclear with your attorney.
Progress billing
Most construction work is billed as the job proceeds, not at the end. Common approaches include billing by percent complete against a schedule of values, billing at milestones, or billing time and materials.
Many commercial jobs use an AIA-style pay application, a standard form family from the American Institute of Architects. In general terms, it breaks the contract into line items, the schedule of values, and for each line shows work completed to date, stored materials, the retainage held, and the amount due this period. Each application builds on the last, so errors carry forward.
For the books, this means:
- Invoices are tied to the schedule of values, not a lump sum.
- Change orders are tracked and added to the contract value when approved.
- Retainage is calculated on each billing and posted to the right accounts.
- Billed to date can be compared with cost to date and with the original contract.
The WIP schedule and over/under billing
The work in progress schedule is a job-by-job summary, usually prepared monthly. For each open job it typically shows:
- Total contract value, including approved change orders
- Estimated total cost
- Costs incurred to date
- Percent complete
- Revenue earned to date
- Amount billed to date
- Over billing or under billing
Here is how over/under billing works. Percent complete times contract value gives you revenue earned so far. Compare that to what you actually billed.
- Billed more than earned: overbilled. You have collected, or can collect, cash for work not yet done. It shows as a liability, often called billings in excess of costs and estimated earnings.
- Billed less than earned: underbilled. You have done work you have not yet invoiced. It shows as an asset, often called costs and estimated earnings in excess of billings.
Why it matters: an overbilled job can make cash look healthy while future costs have not hit yet. An underbilled job can hide a cash crunch. The WIP schedule also exposes jobs where estimated total cost now exceeds contract value, which means you are headed for a loss on that job. Lenders and sureties often ask for it. It sits well beside the monthly financial reports for a small business you already review.
Percentage-of-completion vs completed-contract
These are two ways to recognize revenue on long jobs.
Percentage of completion. Revenue and profit are recognized as the work progresses, based on costs incurred against estimated total costs or another measure of progress. This is what the WIP schedule supports. It gives a more even picture of income across periods.
Completed contract. Revenue and profit are recognized when the job is substantially finished. It is simpler but can make results lumpy.
Which method you can or must use depends on your financial reporting requirements, contract size and duration, and tax rules. The IRS discusses long-term contract methods in Publication 538, Accounting Periods and Methods. The details change and the thresholds matter, so confirm the right method for your business with your CPA before you set up your books around one.
Certified payroll
Certified payroll applies to many government-funded construction projects, particularly those covered by federal prevailing wage laws such as Davis-Bacon. In general terms, the contractor submits weekly payroll reports showing each worker, their classification, hours worked, and pay rate, along with a signed statement that wages meet the required rates.
For the bookkeeper, that means:
- Employees need correct job classifications and pay rates by project.
- Hours must be tracked by job and by day.
- Reports must be prepared on schedule and kept with the job records.
- Fringe benefits and deductions need to be documented.
The Department of Labor explains the program on its construction contracts page. State and local prevailing wage programs may add their own requirements, so check what applies to each project.
Putting it together
A construction close is a month-end close with job steps added. It usually looks like this:
- Code all bills, payroll, and expenses to jobs and cost codes.
- Post progress billings and retainage.
- Reconcile bank and credit card accounts.
- Update estimated cost to complete with project managers.
- Build the WIP schedule and record over/under billing.
- Review job margins and flag jobs trending below estimate.
- Send reports to the owner and CPA.
This takes someone who understands the structure, not just the software. If you want help with the recurring work, TaskMasters places dedicated, degreed, QuickBooks-certified offshore bookkeepers and accountants who work US hours inside your file. You can see the roles on our services page.
- $2,200 a month for 40 hours a week, plus a one-time setup fee confirmed on the fit call
- 14 to 21 days from fit call to an embedded operator
- A 30-Day Right-Fit Guarantee: if it is not right within 30 days, we re-vet and place someone else at no cost, or you exit and we refund the wages you have paid plus a portion of the setup fee
Common questions
What is the difference between job costing and regular bookkeeping?
Regular bookkeeping tracks income and expenses for the whole business. Job costing assigns each cost and each billing to a specific job, so you can see profit by project.
What is retainage in construction accounting?
Retainage is a portion of a payment withheld until work is complete. It is tracked as retainage receivable when held by a customer and retainage payable when you hold it from a subcontractor.
What does over billing mean?
Over billing means you have billed more than the work completed to date would earn. It is recorded as a liability until the work catches up.
Which revenue method should a contractor use?
It depends on contract size, duration, and reporting and tax requirements. Ask your CPA to confirm the right method.
What is certified payroll?
It is a weekly payroll report, required on many government-funded projects, showing each worker's classification, hours, and pay along with a signed statement of compliance.